Page tree
Skip to end of metadata
Go to start of metadata

Status:

 COMPLETED    

Points of Contact:

help@pawsey.org.au 

Start Date/Time (AWST):

 06:00

Responsible:

David Schibeci (Technical Manager, Capital Refresh)

Estimated End Date/Time (AWST):

 20:00

Accountable:

Mark Gray (Head of Scientific Platforms)  

End Date/Time (AWST):

09:30

Informed:

Summary:

HPE Mandated Outage

Systems/Services Affected:

Setonix

Status Page URL:

https://status.pawsey.org.au/incidents/x9m2csjd9vrb

Description:

HPE require an outage to update the Slingshot fabric configuration and remediate faulty slingshot cables

Changes:

  • Updated SHCD and incorrect fabric template.
  • Remediation of faulty Slingshot cables.

Updates:

  • HPE will provides us with an update by 5 PM (AWST)
  • 5PM: HPE are having issues bringing up the Slingshot fabric. They need help from the Slingshot team in the US. Pawsey will not get Setonix back tonight.

Wed 5th April

  • 6 AM: HPE have handed Phase 1 + 70% Phase 2 CPUs to Pawsey and we are currently testing the system.
  • 9:30 AM: Reservation has been removed. Setonix has been returned to service.